Our pump removal winch is on its way to Aksaray

14 July 2026

Our pump removal winch is on its way to Aksaray

Our pump removal winch is on its way to Aksaray

14 July 2026

The BP814 deep-well pump removal winch ordered by Öz Kardeşler Sondaj for their field operations in Aksaray has left our facility. Hydraulic testing and final checks were completed before dispatch, and the machine set off with our team seeing it on its way.

The BP814 is built for pulling and installing deep-well submersible pumps and lifting pipe strings. It works with fine speed control at the wellhead, and its PTO-driven hydraulic unit and automatic rope spooling reduce operator fatigue over long shifts.

Installation and operator training will be carried out on site by our technical team. Our congratulations to Öz Kardeşler Sondaj — we wish them productive and safe work.

Call us for detailed information

+90 332 237 34 72
Call Now